Brieflist

Scaling Interoperable V2X: bidirectional charging

UK registered organisations can apply for a share of up to £15 million for collaborative projects. The programme aims to accelerate provision of EV flexibility for the UK electricity system by 2030 through interoperable bidirectional charging.

Read the official page on Find a grant ↗Start an application ↗ Get new grants like this

Funder
UK Research and Innovation (UKRI)
Where
🇬🇧 United Kingdom — England
Status
Closes 27 Jan 2027 · 68 days left
Opened
10 Nov 2026
Funding
£2m–£7.5m per award (£15m in total)
Who can apply
Most organisations
Topics
Innovation & technology Energy Transport & infrastructure

About this grant

Text update 11 November 2026: We have expanded the aim of the competition requirements (first bullet point).

Description

UK Research and Innovation (UKRI), will invest up to £15 million from the UKRI Research & Development Missions Accelerator Programme: Clean Energy Superpower Mission. This is subject to a sufficient number of high quality applications being received.

This investment will accelerate the provision of electric vehicle (EV) flexibility for the UK electricity system by 2030 through interoperable vehicle to everything (V2X) bidirectional charging. This will contribute to the Mission ambition of delivering at least 2 gigawatts (GW) of additional peak time consumer led flexibility by 2030.

You can refer to the supporting information section for further context to this competition.

The aims of this competition are to:

develop reliable, reproducible, cybersecure, multiparty interoperable domestic and non-domestic V2X products and propositions that will maximise the delivery of EV flexibility by 2030 and beyond

bring together diverse stakeholders across the V2X value chain, spanning the energy and transport sectors, to tackle barriers to the scale up of V2X bidirectional charging

increase grid operators’, users, investors and wider sector confidence in V2X

accelerate market adoption of interoperable V2X through evidence, education and knowledge sharing

Your project must:

develop multiparty interoperability solutions to ensure that EV flexibility is user centred, equitable, and delivered for the long term

evidence those multiparty interoperable V2X solutions at an impactful scale, in a multi-seasonal, real world context, to build an understanding of reliable flexibility under varying demand, generation and market conditions

deliver evidence of the energy flexibility generated by that solution

share lessons learnt and disseminate widely to build sector capability, increase market confidence and accelerate adoption of V2X

test and evidence multiparty interoperable solutions with relevant V2X standards

In applying to this competition, you are entering into a competitive process. This competition has a funding limit, so we may not be able to fund all the proposed projects. It may be the case that your project scores highly but we are still unable to fund it.

UKRI may decide not to fund an application if it does not meet the required quality threshold or strategic objectives.

UKRI reserves the right to adjust the funding allocation or not to make an award.

Our experience from similar competitions suggests that you could have 20% chance of success.

We consider a range of factors when determining whether to provide funding to applicants. This includes an assessment of prior conduct, such as any outstanding payments owed to Innovate UK or UKRI. Such factors may influence the funding decision, potentially resulting in a refusal of funding or an award subject to additional scrutiny.

We also reserve the right to adjust funding allocations for any of our competitions. This may be in response to changes in policy, portfolio funding considerations or broader government funding decisions.

This competition closes at 11am UK time on the deadline stated in this Innovate UK competition brief. We cannot guarantee other government or third party sites will always show the correct competition information.

Project size

Your project’s total eligible grant funding request must be between £2 million and £7.5 million. Under RD&I Streamlined Route rules, no more than £3 million grant funding can be awarded to a single enterprise in one competition.

Accessibility and inclusion

We welcome and encourage applications from people of all backgrounds and are committed to making our application process accessible to everyone. This includes making reasonable adjustments for people who have a disability or a long term condition and face barriers applying to us.

You can contact us at any time to ask for guidance.

We recommend you …

Objectives

Text update 11 November 2026: We have expanded the aim of the competition requirements (first bullet point).

Your proposal

This competition is part of the Consumer Led Flexibility (CLF) Challenge within the Clean Energy Superpower Mission (CESM), which is part of the UKRI R&D Missions Accelerator Programme.

The aims of this competition are to:

develop reliable, reproducible, cybersecure, multiparty interoperable domestic and non-domestic V2X products and propositions that will maximise the delivery of EV flexibility by 2030 and beyond

bring together diverse stakeholders across the V2X value chain, spanning the energy and transport sectors, to tackle barriers to the scale up of V2X bidirectional charging

increase grid operators’, users, investors and wider sector confidence in V2X

accelerate market adoption of interoperable V2X through evidence, education and knowledge sharing

Your project must :

develop multiparty interoperability solutions to ensure that EV flexibility can be delivered equitably and for the long term

evidence those multiparty interoperable V2X solutions at an impactful scale, in a multi-seasonal, real world context, to build an understanding of reliable flexibility under varying demand, generation and market conditions.

increase grid operators’ confidence in V2X

deliver evidence of the energy flexibility generated by that solution

share lessons learnt and disseminate widely to build sector capability, increase market confidence and accelerate adoption of V2X

test and evidence multiparty interoperable solutions with relevant V2X standards

All bidirectional V2X charging technology solutions are in scope for this competition, provided they can demonstrate multi-party interoperability at scale, This includes: AC, DC, low and high power, wired and wireless V2X solutions.

Any in-front-of or behind-the-meter V2X solution is in scope for this competition provided it can demonstrate and evidence customer led flexibility (CLF) at scale. This includes:

vehicle to grid (V2G), vehicle to home (V2H), vehicle to building (V2B), vehicle to vehicle (V2V), vehicle to load (V2L)

solutions providing resilience to the energy system

Both domestic and non-domestic use cases are in scope for this competition, provided that EV’s are used to provide customer led flexibility at scale. This includes:

private and public use

private and public spaces

private and publicly accessible charging locations

Users of EV’s of any size are in scope for this competition, provided they can participate in the required demonstration of multiparty interoperability and evidence the flexibility provided. This includes:

on road electric vehicles

agricultural and construction road-going electric motor vehicles, which can provide scalable flexibility and resilience

All projects must provide evidence to support market growth and encourage adoption of V2X. This includes but is not limited to:

quantifiable real world flexibility data

qualitative results regarding user experience and wider energy system benefits

modelling to provide confidence that the solution can scale beyond the funded project

battery state of health monitoring for the EV’s within the funded solution

Your project must:

align with relevant international standards and specifications, including ISO 15118-20, to support interoperability and scalability of V2X solution

make substantive contributions to International Energy Agency (IEA) Task 53: We encourage all technical consortium partners to become active participants in Task 53 to continue the UK’s leading role in this space (to enable this, membership and participation costs can be included as eligible project costs)

provide a Benefits Realisation Plan at month three

report against UKRI-defined impact metrics and key performance indicators, provide project data including flexibility evidence, participate in monitoring, evaluation and learning activities, and submit a final project report upon project …

Dates

16 November 2026

Online briefing event: recording to follow

Briefing slides are available to download from Supporting Information

2 March 2027

Invite to interview

22 March 2027

Interview panel starts

24 March 2027

Interview panel ends

2 April 2027

Applicants notified

1 June 2027

Project start by

Eligibility

Who can apply

Your project

Your project must:

have a total grant funding request of between £2 million and £7.5 million

last between 18 and 31 months duration

start by 1 June 2027

end by 31 December 2029

Any organisation receiving funding must carry out its project work in the UK, intend to exploit the results in the UK, and spend most of the funding within the UK.

Projects must always start on the first of the month, even if this is a non-working day. You must not start your project until your Grant Offer Letter has been approved by Innovate UK. Any delays within Project Setup may mean we need to delay your project start date.

You must only include eligible project costs in your application. See our overview of eligible project costs.

We encourage all technical consortium partners to become active participants in Task 53 to continue the UK’s leading role in this space. To enable this, membership and participation costs can be included as eligible project costs.

You can read the Background Information section for more information on Task 53 and the benefits of membership.

If your project’s total grant funding request or duration falls outside of our eligibility criteria, you must provide justification by email to [email protected] at least 10 working days before the competition closes. We will then decide whether to approve your request.

If your project does not meet our criteria and you have not requested justification approval, your application will be made ineligible and it will not be sent for assessment.

Lead organisation

To lead a collaborative project your organisation must be a UK registered business of any size or a research and technology organisation (RTO).

More information on the different types of organisation can be found in our Funding rules.

Academic institutions cannot lead.

Project team

To collaborate with the lead, your organisation must be one of the following UK registered:

business of any size

academic institution

charity

not for profit

public sector organisation

research and technology organisation (RTO)

Participation from multiple organisations across the V2X value chain is encouraged. Applicants should consider how their consortium composition will maximise impact by 2030.

Collaborative projects must also include, or clearly demonstrate access to, appropriate energy system expertise. Without this capability, it is unlikely that projects will be able to deliver the real world impact by 2030 required …

Applying for grants? Grants Pro e-mails you every morning with the new grants and opened forecasts that match your saved searches, and adds deadline reminders in your calendar, a private RSS feed and CSV export. Try it free for 7 days, then $9/month, cancel any time. See what Pro does →

Applying? Read how to write a winning grant proposal.

Contains public sector information licensed under the Open Government Licence v3.0 (Find a grant). Last checked 19 Nov 2026. Always read the official page before applying: it has the full conditions, documents and how to apply.

Similar grants

Investor Partnerships – Battery Innovation Programme

Innovate UK, part of UK Research and Innovation, is delivering the Battery Innovation Programme on behalf of the Department for Business, Innovation, Science and Trade (DBIST). · UK · £35k–£900k

Closes 25 Nov 2026 · 5 days left Small businesses